Project Location: Dongguan City, Guangdong Province
Main products: optical instruments, automatic electronic beauty devices, electronic sensors, industrial controllers, medical oxygen catheters, signal counters, etc.
Project overview: This project is a purification and decoration project of precision electronic workshop, designed according to GMP clean room and national standards for HVAC. The air-conditioning system is a screw-machine air conditioner and a purification combination wind cabinet, with a cooling capacity of 1020RT. Using Siemens automatic control system, the cleanliness level of the workshop is 100,000 clean room. The workshop temperature is controlled at 22-26 ℃, the humidity is 50%-60%, and the total workshop area is about 4500 square meters.
The wall is made of rock wool color steel plate, and the ceiling is made of handmade glass magnesium color steel plate. The door body is made of molded steel, the glass window is made of tempered glass, and the floor is PVC floor. The workshop adopts LED lighting, the illumination is 500 illuminance, and the relevant power failure emergency lighting panel is equipped. Process air piping and industrial sockets.
This project belongs to the general contracting project of decoration, purification, electromechanical, weak current, fire protection and so on. It is the second cooperation between Zhuowei Purification Company and customers, and the construction period is 60 days. As of now, it is still under normal construction.
The acceptance of purification and decoration project is divided into three stages, namely empty state acceptance, static acceptance and dynamic acceptance. Empty state acceptance refers to the inspection and acceptance of the condition that has been completed and the machinery and equipment have not yet entered the site. Static refers to the detection of machinery and equipment entering the site but not running and no people moving. Dynamic refers to the detection of the normal movement of the relevant personnel when the machine is running. The three inspections are carried out gradually, and all three inspections are qualified, that is, the inspection of the clean room is up to the standard.




English
Español
Português
русский
français
日本語
Deutsch
Tiếng Việt
Italiano
Nederlands
ไทย
Polski
한국어
Svenska
magyar
Malay
বাংলা
Dansk
Suomi
हिन्दी
Pilipino
Türk
Gaeilge
عربى
Indonesia
norsk
اردو
čeština
Ελληνικά
Українська
Javanese
فارسی
தமிழ்
తెలుగు
नेपाली
Burmese
български
ລາວ
Latine
Қазақ
Euskal
Azərbaycan
slovenský
Македонски
Lietuvos
Eesti Keel
Română
Slovenski
मराठी
Српски
简体中文
Esperanto
Afrikaans
Català
עִברִית
Cymraeg
Galego
繁体中文
Latvietis
icelandic
יידיש
Беларус
Hrvatski
Kreyòl ayisyen
Shqiptar
Malti
lugha ya Kiswahili
አማርኛ
Bosanski
Frysk
ជនជាតិខ្មែរ
ქართული
ગુજરાતી
Hausa
Кыргыз тили
ಕನ್ನಡ
Corsa
Kurdî
മലയാളം
Maori
Монгол хэл
Hmong
IsiXhosa
Zulu
Punjabi
پښتو
Chichewa
Samoa
Sesotho
සිංහල
Gàidhlig
Cebuano
Somali
Точик
O'zbek
Hawaiian
سنڌي
Shinra
հայերեն
Igbo
Sundanese
Lëtzebuergesch
Malagasy
Yoruba





