Project Overview:
Project name: injection molding clean workshop decoration project
Project size: 5000 square meters
Cleanliness level: 100,000/300,000
Project address: Shenzhen, Guangdong
Air conditioning system: screw host, air-cooled heat pump
Process pipeline: CDA, waste exhaust, general exhaust, fire alarm, weak current monitoring

Features of injection molding dust-free workshop:
1). The heat of the injection molding machine is large, and the heat generation of the injection molding machine should be considered in detail.
2). Exhaust gas is generated from injection molding, and odorous gas will be generated when the injection molding machine head is working, so local strong exhaust should be considered in the design to remove odorous gas.
3). High cleanliness painting area
Compared with other working areas in the injection molding purification workshop, the spray painting area has higher requirements on cleanliness and requires stricter control of dust. The spray painting area will produce a lot of paint odor, and an independent exhaust should be set up.
4). High heat in the baking area
When the oven door in the baking area is opened, a large amount of heat will be generated. In order to avoid disturbance of the airflow in the injection molding workshop and mutual excuses, the corresponding exhaust air should be designed to remove the heat generated.
5). Negative pressure design
As mentioned above, both the baking area and the painting area will generate a large amount of heat. In order to avoid heat discharge and cause airflow disorder, a negative pressure must be designed (relative to the adjacent clean area), so that the airflow can only come in and out.
Purification and exhaust of injection molding dust-free workshop:
Outdoor air → wet curtain → primary filter → medium efficiency filter → (central air conditioning heating or cooling) → high pressure fan → air supply duct → high-efficiency air supply port → clean room → waste gas collection bell mouth → exhaust duct → (activated carbon waste gas processing equipment) → high-pressure exhaust fan → 15 meters high-altitude discharge

Injection molding dust-free workshop planning:
Ensure absolute isolation of all scrap, feed and mixing workshops.
1). The feeding and mixing rooms are independently separated into small rooms. The equipment is commonly used, such as drying machine, mold temperature meter, feeder and other equipment. The layout of the pipeline should be considered in advance to prevent the pipeline from passing through the dust-free wall in the later stage. .
2). The crushing room must be far away from the clean room area.
3). The mold room is best placed outside the dust-free injection molding workshop, and the clean room must be treated by air before entering.
4). Mold lifting equipment For small injection molding machines, small gantry electric hoists can be used;
5). Circulation isolation and transportation of logistics.


English
Español
Português
русский
français
日本語
Deutsch
Tiếng Việt
Italiano
Nederlands
ไทย
Polski
한국어
Svenska
magyar
Malay
বাংলা
Dansk
Suomi
हिन्दी
Pilipino
Türk
Gaeilge
عربى
Indonesia
norsk
اردو
čeština
Ελληνικά
Українська
Javanese
فارسی
தமிழ்
తెలుగు
नेपाली
Burmese
български
ລາວ
Latine
Қазақ
Euskal
Azərbaycan
slovenský
Македонски
Lietuvos
Eesti Keel
Română
Slovenski
मराठी
Српски
简体中文
Esperanto
Afrikaans
Català
עִברִית
Cymraeg
Galego
繁体中文
Latvietis
icelandic
יידיש
Беларус
Hrvatski
Kreyòl ayisyen
Shqiptar
Malti
lugha ya Kiswahili
አማርኛ
Bosanski
Frysk
ជនជាតិខ្មែរ
ქართული
ગુજરાતી
Hausa
Кыргыз тили
ಕನ್ನಡ
Corsa
Kurdî
മലയാളം
Maori
Монгол хэл
Hmong
IsiXhosa
Zulu
Punjabi
پښتو
Chichewa
Samoa
Sesotho
සිංහල
Gàidhlig
Cebuano
Somali
Точик
O'zbek
Hawaiian
سنڌي
Shinra
հայերեն
Igbo
Sundanese
Lëtzebuergesch
Malagasy
Yoruba





